SitePlans.us

Home » Charlotte Site Plan

You need a site plan. Charlotte’s Planning, Design & Development Department needs it to be complete. You don’t have to learn the zoning code. We already know it.

You found the contractor. You set the start date. Then Charlotte sends back a correction letter. “Tree preservation not shown.” “Flood zone note missing.” “Detached ADU limited to 800 sq ft (or 35% of the primary residence, whichever is greater)”

Four weeks in the resubmission queue. The crew moves to another job. Your project stalls.

That’s what happens when a site plan is incomplete. Charlotte reviewers don’t reject your project – they reject missing paperwork. We fix that before you submit.

Upload your address. We pull parcel records, verify setbacks, calculate lot coverage, add tree and flood notes, and deliver a PDF that meets Charlotte’s checklist.

What Actually Gets Flagged in Charlotte (From Real Correction Letters)

Charlotte’s Land Development division reviews hundreds of residential plans. These are the most common reasons they send plans back – and what we include so you don’t get the same letter.

the city does enforce tree preservation through the Charlotte Tree Ordinance (Article 20). No specific correction needed.

Charlotte enforces tree preservation. We identify protected trees, show driplines, and add required notes.

“Flood zone reference missing. FEMA panel number required – many properties near Little Sugar Creek and McAlpine Creek.”

We add the correct FEMA panel number. Even in low‑risk zones, the city wants the reference.

“ADU exceeds maximum floor area. Detached ADU limited to 750 sq ft (or up to 1,000 sq ft if larger than primary structure).”

We verify ADU size, height, and lot coverage before you order.

“Setback measured from foundation, not eave.”

Charlotte measures to the furthest projection – roof overhang, gutter, chimney. Foundation measurement is always wrong. We measure from the eave.

“A Storm Water Management Permit is required for all new development and redevelopment projects, regardless of size”

We add flow arrows, retention notes, and reference Charlotte’s stormwater design manual.

“Impervious surface calculation missing or does not match zoning district limit.”*

We calculate lot coverage and show the math. Exceed the cap? We tell you before you submit.

“Easement shown without recorded instrument number.”

“Utility easement” alone gets rejected. We add book/page references from county records.

What Your Charlotte Site Plan Includes (And Why Each Item Matters)

You don’t need to learn Charlotte’s zoning code or tree ordinance. You just need a plan that passes. Here’s what we deliver – and why reviewers check for it.

 
 
What We Include Why Charlotte Reviewers Flag It
Property lines from recorded plats GIS data is rounded. Reviewers compare against legal documents. We use exact dimensions.
Setbacks from the eave Foundation measurements fail every time. We measure from the furthest projection.
Easements with book/page numbers “Utility easement” alone gets rejected. We add recorded instrument numbers.
Tree preservation notes Charlotte enforces tree codes. We identify protected trees and add required language.
ADU size, height, lot coverage 800 sq ft max (or 1,000 if larger than primary). We verify before you pay.
Flood zone + FEMA panel number Required even for low‑risk properties. We add the correct panel.
Stormwater management notes Flow arrows, retention, erosion control – required for any disturbance over 1 acre.
Impervious surface calculation Charlotte enforces lot coverage limits. We calculate and show the number.
North arrow + engineering scale Missing these? Rejected before review starts. We include them on every sheet.

You don’t need to learn any of this. We handle it.

Pricing – Simple, No Surprises

Service Price
Basic Site Plan (setbacks, property lines, existing/proposed) $89
Enhanced Plan (+ lot coverage, flood note, tree notes, easements, stormwater) $149
Premium Plan (+ ADU compliance, grading, complex lots) $249+

✅ Free revisions if Charlotte asks for changes
✅ 24‑hour turnaround for most residential plans

Real Charlotte Story – ADU Rejected Twice, Fixed in 24 Hours

Why Homeowners Get Site Plans Online from Us

Quick Answers – Before You Order

Most residential plans in 24 hours. ADUs or complex grading may take a bit longer – we’ll quote you.

We revise for free. Send it to us, and we update the plan. No extra charge.

We add NOA (Notice of Acceptance) number references for impact‑resistant glazing, doors, and garage doors where applicable.

Not for most projects. We use recorded plats and county GIS. If your property has a boundary dispute, we may recommend one.

Yes. Hundreds of Charlotte projects. For ADUs, we check the 750 sq ft cap (or 1,000 if larger than primary), height, and lot coverage.

We add tree notes and stormwater language to every plan – so you don’t get a correction letter for missing them.

Click below, enter your address, and checkout. We do the rest.

Get Your Charlotte Site Plan – Basic $89 →

  • Charlotte Planning, Design & Development – 600 E 4th St, Charlotte, NC 28202. Call (704) 336‑4621. Website: charlottenc.gov/planning

  • Charlotte Permit Portal – Accela – Online applications and plan review: charlotte.accela.com

  • Charlotte Zoning Code – Unified Development Ordinance (UDO), including ADU rules (750 sq ft cap, 1,000 sq ft if larger than primary).

  • Tree Preservation Ordinance – Protected species, preservation requirements, mitigation fees.

  • Stormwater Design Manual – Required for any disturbance over 1 acre; flow arrows and retention notes mandatory.

  • FEMA Flood Map Service Center – Official flood zone determinations: msc.fema.gov

Stop Waiting. Stop Guessing. Buy a Plan That Passes.

No surveys. No site visits. No zoning homework. Enter your address, checkout, and get a reviewer‑ready PDF in 24 hours. Free revisions if the city asks for changes. Give Your Address → Order Your Charlotte Site Plan

Based on Charlotte Unified Development Ordinance, Tree Preservation Ordinance, and stormwater requirements as of June 2026. We keep up with the rules so you don’t have to.

Nearby Cities & More Site Plan Locations

Serving homeowners and contractors across North Carolina and nationwide.
We prepare permit‑ready site plans for the following cities – and deliver them online, no site visit required.

Other cities we’ve helped (Sunbelt States):
Phoenix | Tucson | Las Vegas | Denver | Colorado Springs | Austin | Dallas | Houston | Fort Worth | Atlanta | Savannah | Portland | Seattle | Charlotte | Raleigh | Nashville | Orlando | Jacksonville | Tampa | Miami

Don’t see your city? We cover all 50 states. Just enter your address at checkout.

98% First‑Time Approval. You Read That Right.

Most homeowners wait weeks for a rejection. Our plans are built to pass on the first submission – because we already know what reviewers flag.

Upload Your Address at 9 AM. Get a Reviewer‑Ready Plan by Tomorrow.

24‑hour turnaround. Free revisions if the city asks for changes. No surprises. No resubmission headaches.

Stop Researching. Start Uploading. We’ll Handle the Rest.

No surveys. No site visits. No zoning homework. Enter your address, checkout, and get a reviewer‑ready PDF in 24 hours. Free revisions if the city asks for changes.
Buy Charlotte Site Plan NOW

Your Contractor Is Waiting. Don’t Let a Missing Note Cost You 4 Weeks.

One missing setback or easement reference pushes your permit to the back of the queue. We catch it before you submit.

What Charlotte Homeowners Say About Getting Their Permits Approved

Platinum Site Plan

Highest Acceptance Rate for New Homes, Commercial & Complex Projects
$380
$ 249 The most comprehensive plan
  • Highest acceptance rate
  • 24‑hour turnaround , No on‑site visit , Expert support
  • Prepared by Professional Autodesk Certified Civil 3D Drafters
Best Buy
Scroll to Top