Site Plan for Permit in Dallas, TX – $89 , 24-Hour Delivery, Built for PD Districts and the Trinity River Corridor
Two different sources will tell you Dallas caps ADUs at 800 square feet. Another will tell you it's 1,000 square feet or 30% of the primary dwelling. Both can be correct — depending on which approval pathway your property is on, and that pathway depends on whether your lot sits inside an established ADU Overlay or has to go through Dallas's separate city action process.
The correction letter read: “Proposed ADU exceeds size limit applicable to this lot’s approval pathway. Property is not within an established ADU Overlay — city action process applies. Setback dimensions reference Overlay standards not applicable to this parcel.”
The homeowner had researched Dallas ADU rules online, found the 1,000 sq ft / 30% figure, and designed to it. The figure wasn’t fabricated — it’s a real standard that applies to some Dallas properties. It just wasn’t the standard that applied to this one, because this lot wasn’t inside an ADU Overlay, and properties outside an Overlay go through a different process with different governing figures.
Dallas’s residential permitting has several of these pathway-dependent details: PD (Planned Development) districts and Conservation Districts that override base zoning code entirely for the neighborhoods they cover, a 20-foot alley setback for garages with alley-facing vehicle entrances — separate from the standard 5-foot accessory structure setback — and the Trinity River Corridor Development Certificate, a permit required for any floodplain alteration within the Trinity River Corridor that’s separate from a standard floodplain development permit.
We draft Dallas site plans by checking the GIS Interactive Map for PD/Conservation District overrides, determining which ADU pathway applies, and verifying Trinity River Corridor status — before applying any setback or size figure.
- Free revisions if Dallas Development Services returns comments
- 24-hour turnaround for most residential plans
- Fixed price — $89 to $249
What Makes Dallas Permitting Pathway-Dependent
ADU size and setback standards depend on which approval pathway your property follows — and that depends on ADU Overlay status. The Dallas City Council approved a framework for ADU construction and rental in 2018, but unlike Austin’s by-right approach in many residential zones, Dallas requires clearing additional approval steps. Properties within an established ADU Overlay follow the setback rules written into that specific overlay — rules that were negotiated between the city and the neighborhood’s planning committee, and which can differ meaningfully from one overlay to the next. Properties not within an ADU Overlay go through a city action process, where setbacks and size limits are determined during that approval and often align with standard single-family or duplex zoning requirements rather than overlay-specific figures. The size limit commonly cited — 1,000 square feet or 30% of the primary dwelling’s floor area, whichever is less — applies in some contexts; an 800 square foot cap applies in others. Which figure governs depends on the pathway, and the pathway depends on whether the specific parcel sits inside an ADU Overlay. This is the single detail most likely to produce a mismatch between what a homeowner researched online and what their specific property is actually subject to.
PD districts and Conservation Districts override base zoning entirely — and Dallas has a lot of them. Many Dallas neighborhoods are governed by Planned Development (PD) districts or Conservation Districts (CD), each with custom standards for setbacks, height, lot coverage, and architectural requirements that supersede the citywide base zoning code. A site plan drafted from Dallas’s general residential zoning standards — without checking whether the specific parcel falls within a PD or CD — may apply setback figures that simply don’t govern that property. The Dallas GIS Interactive Map identifies PD and CD status, zoning district, floodplain designation, and historic district status by address, and checking it is the first step for any Dallas parcel, not an optional refinement.
Garage setback from an alley depends on which direction the garage faces. The standard accessory structure setback in Dallas is 5 feet from any other building on the same lot and 5 feet from an alley line. But when the entrance to an accessory building — typically a garage — faces the alley for automobile access, that structure must be set back at least 20 feet from the alley line, not 5. This is a fourfold difference triggered entirely by which direction the garage door faces, and it’s a detail that’s easy to miss when a site plan is drawn without specifying door orientation relative to the alley.
The Trinity River Corridor has its own permit — separate from standard floodplain development permits. Article V of the Dallas City Code establishes the Trinity River Corridor — the floodplain of the West Fork, Elm Fork, and mainstem segments of the Trinity River within Dallas city limits, as delineated on the Corridor Development Certificate (CDC) Regulatory Map. Any floodplain alteration within this corridor — construction, grading, filling, excavation — requires a Corridor Development Certificate from the Director of Water Utilities, in addition to whatever standard floodplain compliance otherwise applies. For properties near the Trinity River specifically (as opposed to other Dallas waterways), this is an additional permit layer beyond the general Article V floodplain requirements that apply citywide.
Standard floodplain rules require 2 feet of freeboard above BFE, and substantial improvement triggers full compliance regardless of project type. Outside the Trinity River Corridor, Article V (Flood Damage Prevention) still applies citywide: flood zone verification against current FEMA maps and the city’s regulatory floodplain maps is required for all permits, new residential construction must be elevated at least 2 feet above Base Flood Elevation, no development is permitted within the regulatory floodway, and improvements exceeding 50% of the property’s market value trigger full floodplain compliance — meaning even a “small” remodel can trigger floodplain requirements if its cost crosses that 50% threshold relative to the property’s value.
What Real Dallas Correction Comments Say
“Proposed ADU size and setbacks reference standards for properties within an established ADU Overlay. GIS records indicate this parcel is not within an ADU Overlay district — city action process standards apply instead. Resubmit with applicable size limit and setback dimensions for this parcel’s approval pathway.”
We check ADU Overlay status via the Dallas GIS Interactive Map before applying any ADU size or setback figure — because the figure that’s correct depends entirely on which pathway the specific parcel is on.
“Property located within [PD District / Conservation District]. Base zoning code setback and lot coverage standards do not apply. District-specific standards govern. Resubmit with setbacks per applicable PD/CD ordinance.”
We check PD and Conservation District status for every Dallas parcel via GIS before drafting — because these districts override base zoning entirely, and a plan built from base zoning standards for a PD/CD parcel is built from the wrong code section.
“Garage entrance faces alley. Garage setback from alley shown at 5 feet. Accessory structure with alley-facing vehicle entrance requires minimum 20-foot setback from alley line. Resubmit with corrected dimension.”
We confirm garage door orientation relative to the alley and apply the 20-foot setback when the entrance faces the alley — versus the standard 5-foot accessory structure setback when it doesn’t.
“Property located within Trinity River Corridor per CDC Regulatory Map. Proposed construction constitutes floodplain alteration within Corridor. Corridor Development Certificate required from Director of Water Utilities, in addition to standard floodplain compliance. Resubmit with CDC referenced.”
For parcels within the Trinity River Corridor specifically, we flag the Corridor Development Certificate requirement — a permit layer beyond standard Article V floodplain compliance that applies only within this specific corridor.
“Improvement value exceeds 50% of property market value. Substantial improvement threshold triggers full floodplain compliance per Article V, regardless of improvement scope. Finished floor elevation must be 2 feet above Base Flood Elevation. Resubmit with FFE documentation.”
We flag the substantial improvement threshold for projects in flood-designated areas — because crossing the 50% market value threshold triggers full Article V compliance even for projects that don’t otherwise resemble “floodplain construction.”
“Setback dimension shown measured to foundation wall. Furthest projection required for setback measurement. Resubmit with corrected dimensions.”
Standard furthest-projection measurement applied on every Dallas plan.
What Every Dallas Site Plan We Deliver Includes
| Element | Why It Matters in Dallas’s Pathway-Dependent Framework |
|---|---|
| Property lines from Dallas County Appraisal District (DCAD) records | Legal dimensions; DCAD account number referenced |
| GIS-verified PD / Conservation District status | Checked via Dallas GIS Interactive Map before applying any setback or coverage standard — PD/CD districts override base zoning |
| ADU Overlay status and pathway determination | Confirmed whether parcel is within an established ADU Overlay (overlay-specific standards) or requires city action process (different size/setback figures) |
| ADU size per applicable pathway | 800 sq ft or 1,000 sq ft / 30% of primary dwelling — whichever figure applies to the confirmed pathway |
| Garage setback per door orientation | 5 ft standard accessory structure setback, or 20 ft if garage entrance faces an alley for vehicle access |
| Floodplain designation per current FEMA and city regulatory maps | Checked for every parcel; Article V compliance addressed where applicable |
| Trinity River Corridor status | Checked against CDC Regulatory Map; Corridor Development Certificate flagged for qualifying parcels |
| Finished floor elevation — 2 ft above BFE | Calculated for new construction and substantial improvements in flood-designated areas |
| Substantial improvement threshold flag | Improvement value checked against 50% of market value where floodplain designation applies |
| Setbacks measured to furthest projection | Eave, overhang, roof projection — not foundation |
| North arrow, engineering scale, legal description | Required on every sheet |
Real Dallas Case Study — ADU Designed to the Wrong Pathway's Standards
Project: Detached ADU, single-family residential lot, Dallas
What the homeowner submitted: A site plan showing an ADU at 980 square feet — based on the “1,000 sq ft or 30% of primary dwelling, whichever is less” standard the homeowner had found in researching Dallas ADU rules. The primary dwelling was 3,400 square feet, so 30% (1,020 sq ft) exceeded 1,000, meaning 1,000 sq ft was the controlling figure, and 980 sq ft fit comfortably under it.
What came back: “Property not within an established ADU Overlay per GIS records. City action process standards apply. Maximum ADU size under applicable city action standards for this parcel is 800 sq ft. Setback dimensions shown reference Overlay standards not applicable to this parcel’s pathway. Resubmit.”
The actual problem: The 1,000 sq ft / 30% figure the homeowner found was real — it’s the standard that applies in some contexts. But this specific parcel wasn’t within an ADU Overlay, which meant it followed the city action pathway instead, where the applicable cap was 800 square feet. The homeowner’s research wasn’t wrong; it just described a different pathway than the one this property was on.
What we did when the homeowner came to us: Checked the Dallas GIS Interactive Map and confirmed the parcel’s ADU Overlay status — not within an overlay, confirming the city action pathway applied. Revised the ADU footprint from 980 sq ft to 780 sq ft, under the 800 sq ft cap with a margin. Re-derived setback dimensions from standard single-family zoning setbacks (the city action pathway’s reference point) rather than overlay-specific figures. Checked the garage’s door orientation — it faced the rear alley — and applied the 20-foot alley setback rather than the 5-foot standard accessory structure setback the original plan had used.
Outcome: The revised plan, built around the confirmed city action pathway’s standards rather than the overlay figures the homeowner had researched, cleared review on the next submission cycle.
Pricing
| Service | Price |
|---|---|
| Basic Site Plan — property lines, setbacks, existing/proposed structures, north arrow, scale | $89 |
| Enhanced Plan — adds floodplain designation, PD/CD district verification, easements, utility locations | $149 |
| Premium Plan — adds ADU pathway determination and size verification, Trinity River Corridor status check, substantial improvement threshold analysis, complex lot geometry | $249+ |
✅ Free revisions if Dallas Development Services returns comments
✅ 24-hour turnaround for most residential plans
✅ No survey required for most projects — we use DCAD records and Dallas GIS
✅ PD/Conservation District and ADU Overlay status checked on every order
FAQs — Dallas Site Plans
Both can be correct, depending on your property. Dallas’s ADU rules are pathway-dependent: properties within an established ADU Overlay follow that overlay’s specific standards, while properties outside any overlay go through a city action process with potentially different size limits — commonly an 800 sq ft cap. The 1,000 sq ft / 30% figure applies in some contexts but not universally. We check your specific parcel’s ADU Overlay status via the Dallas GIS Interactive Map before applying any size figure, because the correct number depends entirely on which pathway your property is on.
Likely yes. PD (Planned Development) districts and Conservation Districts override the base zoning code’s setback, height, and lot coverage standards with custom requirements specific to that district — negotiated when the PD or CD was established. A site plan built from general Dallas residential zoning standards for a property within a PD or CD is working from the wrong standards entirely. We check PD/CD status via GIS for every Dallas parcel and apply the district-specific standards when they exist.
Yes, significantly. The standard accessory structure setback from an alley line is 5 feet. But if the garage’s vehicle entrance faces the alley — meaning you’d drive in from the alley — the required setback jumps to 20 feet, a fourfold increase. This is determined by door orientation, not by the structure’s general location. We confirm garage door orientation relative to any alley before applying setback dimensions.
Possibly, beyond standard floodplain rules. The Trinity River Corridor — covering the West Fork, Elm Fork, and mainstem Trinity River floodplain within Dallas — has its own permit requirement: a Corridor Development Certificate from the Director of Water Utilities, required for any floodplain alteration within the corridor, in addition to standard Article V floodplain compliance. This is specific to the Trinity River Corridor as delineated on the CDC Regulatory Map — not all flood-designated properties in Dallas are within this specific corridor. We check Trinity River Corridor status for parcels near the river and flag the CDC requirement when it applies.
If your property is in a flood-designated area and your improvement’s value exceeds 50% of the property’s market value, Article V’s substantial improvement provision triggers full floodplain compliance — including the 2-foot freeboard requirement above Base Flood Elevation — regardless of what the project actually is. A kitchen remodel, a major addition, or any improvement that crosses the 50% threshold can trigger this even though it doesn’t resemble “floodplain construction” in any visible way. We check this threshold for properties in flood-designated areas.
The Dallas GIS Interactive Map at dallasgis.com lets you search by address to find your zoning district, any PD or Conservation District standards, historic district status, ADU Overlay status, and floodplain designation, along with your DCAD account number. We check all of this for every order, but it’s also useful for homeowners who want to understand their property’s status independently.
Other Texas Cities We Serve
Austin | Fort Worth | Houston | San Antonio | El Paso | Plano | Frisco | Arlington | McKinney | All Texas Site Plans
Also serving: Sacramento | Jacksonville | Raleigh | Fort Lauderdale | Durham
Don’t see your city? We cover all 50 states. Enter your address at checkout.
Project Types We Cover
Official Dallas Permit Resources
- City of Dallas Development Services Department — Permits, plan review, applications tracked via the Posse online portal
- Dallas GIS Interactive Map — Zoning district, PD/CD status, ADU Overlay status, historic district status, floodplain designation by address: dallasgis.com
- Dallas City Code, Article V (Flood Damage Prevention) — Floodplain compliance, freeboard requirements, substantial improvement provisions, Trinity River Corridor Development Certificate process (Section 51A-5.107)
- Dallas ADU Information — City action process and ADU Overlay standards via Dallas Planning and Development
- Dallas County Appraisal District (DCAD) — Parcel records and account numbers
- FEMA Flood Map Service Center — Flood zone and panel lookups: msc.fema.gov
A Plan Built for Whichever Pathway Your Property Is Actually On
Based on the City of Dallas Development Code, Article V Floodplain and Escarpment Zone Regulations, Dallas GIS records, and Development Services submittal standards as of June 2026.